Success Story: Enhancing the Life Span of 500 MVA ICT through Controlled Switching Devices

In the last two blogs, we have shared our knowledge on the technique of controlled switching to enhance the life expectancy of assets in the electrical network and improve system stability. By discussing how life span of reactors, capacitor bank assets and power transformers can be enhanced through controlled switching, we have underscored the criticality …

Expanding the life span of Power Transformers through Controlled Switching

In our previous blog, we discussed the technique of controlled switching, a widely used technique to improve the life expectancy of assets and system stability. We had seen how the life span of reactor and capacitor bank assets can be extended through controlled switching. In this blog post, we will continue our discussion on controlled …

Expanding the Life Span of Reactor and Capacitor Bank Assets through Controlled Switching

The electricity sector in India has seen rapid growth over the past few decades. With installed capacity of 373 GW, India is able to meet the demand for electricity. As generation capacity has grown, an extensive network of transmission lines has also been developed for evacuating power produced by different electricity generating stations and distributing …

Reading Your Solar PV Installation Output Results with the OrxaGrid Low Carbon App

Image by skeeze from Pixabay

It is widely accepted that widespread adoption of renewable energy sources such as solar and wind into the electric grid will be key to meeting carbon reduction targets and achieving global clean growth ambitions. In a previous blog post, we saw how OrxaGrid's Low Carbon App enables building owners to quickly and accurately calculate the …

Success Story: Earthing and Lightning Protection System Audit

In a previous blog on Health Assessment of Transmission Towers, we underscored the importance of regular maintenance in order to ensure the optimal performance of any infrastructure asset. Improper functioning of earthing and lightning protection system (LPS) would render critical infrastructure at electrical substations at grave risk. Therefore, it is crucial that routine testing and …

Partial Discharge Testing: Need, Testing Methodologies and Addressing Defects

Studies show that over 85% of disruptive failures in high voltage (HV) and medium voltage (MV) equipment are Partial Discharge related. Partial Discharge (PD) activity provides evidence  of deterioration in assets, which can propagate and increase, until the insulation is no longer able to withstand the electrical stress therefore leading to flash-over and finally equipment failure. Therefore, early detection …

Success Story: Commissioning Of Phasor Measurement Units (PMUs) For A Central Transmission Utility

The 2012 grid collapse in India resulting from excess power usage by some states prompted the authorities to conceptualise the idea of ‘One Nation One Grid’ by monitoring and analysing the real-time power usage data at the regional and national level.   To achieve this, Synchrophasor technology is widely used across India for real-time data …

Decoding The Indian Electricity (Amendment) Bill, 2020

The Indian Electricity Act, 2003 (EA 2003) is widely hailed as a landmark piece of legislation that reformed and rejuvenated the power sector in India. The Act ushered in competition in the power sector by permitting the entry of private players, restructuring State Electricity Boards into separate companies for power generation, transmission and distribution, streamlining …